By: Jessica Emily Medina (KETIV)
It’s mid-January of 2018 and the All Access team is in the midst of designing, manufacturing and sending stage pieces out for delivery and setup. Each of the three warehouses they occupy in Torrance, CA is manned at all hours of the day and night, Monday through Saturday. Every machine, employee and space is utilized to it’s maximum capacity. There is no “try,” “maybe” or “can’t,” even though 30% of stages built have never been created before. If you can dream it, All Access can create it. [Click to continue to article.]